Preparation of asphalt batch mixing plant before starting
Asphalt batch mixing plant is the most important equipment in pavement construction. If we want to improve the efficiency of asphalt mixing plant, we must do some work before starting the equipment, which can save more time, labor and cost during processing. Preparation before working is the basic of normal operation, and it is an essential part of producing qualified asphalt. What should we do for preparation? The tips are as following. 1, Notice the weather conditions (such as changes in wind, rain, snow and temperature) to see if it has influence on production. 2, Check the level of the diesel oil tank , the heavy oil tank and the asphalt tank every morning. It should be supplemented in time when the oil level of the tank is only 1/4. 3, Check if the temperature of the asphalt has reach the required level, if the temperature is not reached, then we should be heat the asphalt until reach the standard temperature. 4, Check the amount of aggregate...