How to operate asphalt mix plant after producing

As we have talked about the asphalt mixing plant process guidelines before, that is how to operate the asphalt mixing plant during processing. Then after the production, what should we do to the asphalt mix plant? This is the topic we are going to discuss. asphalt mix plant After shut down the asphalt mixing plant for sale, there are still many steps to do.
1, Control of the total amount of production and the number of hot storage, prepare for downtime according to the need, and notice the relevant personnel in advance.
2, After the qualified material is produced, it is necessary to remove the excess material and clean it, and no excess material should be left inside the drum and the dust-removing room.
3, Asphalt pump need to run the opposite direction, so that there is no residual asphalt in the pipeline.
4, The heat-conducting oil furnace can be flame out and stop heating according to needs.
5, Record the final data of production of the day, such as the output, number of cars, fuel consumption, consumption of asphalt and consumption of various aggregates, and timely notify the paving site and relevant personnel of the relevant data.
6, Clean the equipment after all shut down.
7, Do the lubrication maintenance according to the equipment maintenance plan.
8, Do the equipment failure inspection, repair, adjustment and testing, such as drip oil, spill oil, belt adjustment, etc.
9, Timely release of the mixture stored in the finished silo to prevent temperature falls down, can not successfully open the door.
10, Exhaust the water in the air compressor tank.
Reprinted from:http://www.asphalt-mixing-plants.net/industry-news/asphalt-mix-plant.html

评论

此博客中的热门博文

Where to find asphalt mixing plant near me

Concrete Batching Plant Quotations

Small portable concrete batching plants for sale